FIT-OUT & CONSTRUCTION

Specified early. Integrated cleanly. Handed over once.

The infrastructure partner specified at design stage. One delivery team. One handover.

Fit-out projects fall down at the joins between trades. Cabling specified by one supplier, AV by another, security by a third, controls by a fourth. The handover punch list is where the gaps appear – and where the main contractor takes the hit. Altus is engaged at architectural design, owns the integrated infrastructure scope across connectivity, workplace technology, security, automation and managed handover, and signs off as one accountable partner.

THE OPERATIONAL REALITY

Fragmented subcontractors. One main contractor holding the risk.

The standard fit-out programme tenders the AV, the structured cabling, the access control and the building controls as separate lots. Each comes with a different specification, a different programme position, a different commissioning window. The integration risk sits with the main contractor – and almost always surfaces in the final two weeks before handover, when the trades have already demobilised.

We compress that risk to zero. One contract across connectivity, workplace technology, security and automation. One delivery programme. One commissioning sign-off. The trades behind it remain specialist; the accountability above them is consolidated.

One delivery team. One handover. Designed in at architectural stage.

Switzerland listed building smart home

WHAT WE DELIVER HERE

Five layers, specified together, delivered together.

Five infrastructure layers, specified together, commissioned together.

Connectivity & Cyber

Structured cabling, enterprise switching, secure WiFi, network segmentation. The backbone every other layer depends on. Specified at first-fix, terminated at second-fix, tested before handover.

View Connectivity & Cyber

Workplace Technology

Boardroom, meeting room, collaboration and broadcast environments. AV over IP, one-touch hybrid meeting start, standardised user experience across every room.

View Workplace Technology

Security & Access

IP video surveillance, access control, intrusion, visitor management. Designed for the building’s operating model, integrated under one operator interface.

View Security & Access

Workplace Automation

Lighting, environmental control, smart-home or commercial automation, room booking. Crestron, Lutron, Loxone, Control4. Specified at design, commissioned at handover.

View Workplace Automation

Managed Infrastructure

24/7 monitoring, lifecycle planning, ISO 27001-aligned change control. The cover that begins the day after handover.

View Managed Infrastructure

PROOF

Three projects that prove the fit-out model.

Read case study

Switzerland – Listed Building Smart Home with Integrated Security

Switzerland, pre-1900 6-storey property, integrated automation, security and connectivity from architectural design.

View project

Read case study

Birmingham – Multi-Use Workspace, Media Hub & Collaboration Centre

UK, full fit-out integrating LED video wall, six zones, structured cabling and hybrid AV.

View project

Read case study

Canary Wharf – Workplace Transformation with Wellness & Smart Pods

UK, premium commercial fit-out with wellness, work pod environments and reception identity.

View project

View all projects in this sector

HOW WE ENGAGE

Designed in. Not bolted on.

STEP 1

Engaged at design stage

Walk the architectural plan with the design team. Confirm cable routes, mounting positions, sight lines, acoustic isolation, control room locations. Specification lands in the design drawings, not in the punch list.

STEP 2

Integrated specification

One specification document covering connectivity, AV, security, automation and managed handover. Aligned to the building services performance spec. Tendered cleanly or single-source where the programme demands it.

STEP 3

Delivery under one programme

First-fix containment, second-fix cabling, third-fix devices, commissioning, snagging. One delivery manager. One programme position. One commissioning team.

STEP 4

Clean handover

O&M documentation, asset register, control system back-ups, drawings as-installed, training delivered, snag list closed. Day-one defect liability and managed cover begin under one SLA.

WHY ALTUS

What main contractors actually need from an infrastructure partner.

The integration risk fit-out programmes carry – designed out at the start.

Engaged at design stage

We turn up before the M&E coordination. The infrastructure scope is in the drawings before the cost plan locks. Risk priced in, not surprised in.

One trade across five layers

Connectivity, AV, security, automation and managed handover under one delivery team. No interface gaps. No divided accountability.

Clean handover, every time

O&M documentation, drawings, asset register, training. Day-one defect liability begins. Managed cover takes over from there.

National and international delivery

UK, France, Switzerland, Middle East, USA. Same delivery standard whether the building is in Birmingham or Zurich.

“Companies are rethinking the role of the office. It’s no longer somewhere you have to be – it’s somewhere people choose to be. Technology plays a critical role in making that happen.”

FTSE 100 Media & Publishing Group, programme client

THE NEXT STEP

Book a Fit-Out Critical Systems Review.

We’ll review the integrated infrastructure scope on your live or upcoming fit-out programme, identify the interface risks, and tell you straight where the gaps are. One conversation. One hour.

We tell you straight where the interface risks are on your programme.

Cyber Essentials Plus

ISO 27001

ISO 9001

Cisco Certified

Dante Certified L3

Cisco

Hikvision

Crestron

Samsung

Logitech

Lutron

One contract across five infrastructure layers. Specified at design. Handed over once.